NTH Consultants
Contact Us
  • Home
  • Markets
    • Energy Market
    • Industry Market
    • Water Market
    • Transportation
    • Community Development
  • Services
    • Geotechnical Engineering >
      • Geophysical Services
      • Mapping
      • Shoreline Services
      • Civil Site Engineering and Design
      • Construction Materials & Geotechnical Testing Services
      • Electric Substation Services
      • Geotechnical Engineering for Transportation Facilities
      • Underground Engineering Services
      • Subsurface Utility
      • Signature Projects
    • Environmental Services >
      • PFAS
      • Ecological Services
      • Environmental Health Services
      • Environmental Remediation Services
      • Environmental Compliance
      • Environmental Permitting
      • Environmental Site Assessments
      • Ecological Services for the Energy Market
      • Air Quality Permitting and Compliance
      • Brownfield Site Redevelopment
      • Environmental, Health & Safety Training for Employee Development
      • Hydrogeologic Studies
      • Landfill Related Services
      • Site Acquisition and Redevelopment
      • Storage Tank Services
      • Signature Projects
    • Facilities Engineering >
      • Decommissioning
      • Structural Condition Assessment Rehab
      • Bridge Engineering Services
      • Asset Management Services
      • Concrete Restoration
      • GIS Services
      • Masonry Evaluation Services
      • Pavement Engineering and Consulting
      • Roofing Technology Services
      • Structural Condition Assessment
      • Signature Projects
  • Projects
  • About Us
    • Mission + Core Values
    • Leadership
    • News and Events
    • Employee Portal
  • Webinars
    • Emergency Actions Plans Webinar
  • Careers
    • Why Join NTH
    • Who We Are
    • Career Opportunities
    • NTH Internship Program
  • Blog
  • Contact Us
Back to Award-Winning Projects
Picture
Client:
  • OMID Drainage Board

Partners:
  • Anderson, Eckstein, and Westrick, Inc. (AEW) 
  • Applied Science, Inc. (ASI) 
  • FK Engineering Associates
  • OHM – Engineering Advisors 
  • Spalding DeDecker Associates 

Start Date:
  • February 2014

Completion Date:
  • October 2014

Oakland-Macomb Interceptor Drain Repair Program 
Averting Future Sinkholes

Innovation & Excellence Award: 
Michigan Association of County Drain Commissions (MACDC)

Award of Merit for Engineering:
ACEC/Michigan


Project Description:

In August 2004, a developing sinkhole was encountered at the intersection of Fontana Drive and 15 Mile Road in the City of Sterling Heights, over the Romeo Arm of the Detroit Water and Sewerage Department’s (DWSD) Oakland Macomb Interceptor System (OMIS). As the emergency repair work continued to restore the affected roads and subsurface infrastructure, another question was being raised, “How can we find and prevent future sinkholes?"

Project Approach:
The interceptor that caused the sinkhole has an inside diameter of 11 feet and was located approximately 62 feet below the ground surface. Based on NTH research, the use of Multi-Channel Analysis of Surface Waves (MASW), a geophysical technique that uses seismic waves to determine subsurface conditions, was selected to initiate the search for potential failure areas. Following the restoration of the 2004 sinkhole collapse, MASW was used in conjunction with closed circuit television to inspect the balance of the Romeo Arm interceptor.  

The geotechnical exploration confirmed the presence of disturbed soils and potential voids that were subsequently stabilized from inside the interceptor. Based on the initial findings and correlation between the MASW results and loose soils and voids surrounding the tunnel, NTH was tasked by DWSD to investigate the balance of the OMIS, including the Edison Corridor Interceptor (ECI), Oakland Arm Interceptor (OAI), and the Avon Arm Interceptor (AAI).   

Results:
The investigation report identified the need to complete the geotechnical work and recommended a series of repairs. Ownership of the ECI, OAI, and AAI was later transferred to a Chapter 21 Inter-County Drain managed by the Oakland-Macomb Interceptor Drainage Board.
 
Based upon our knowledge of the conditions in the new Oakland-Macomb Interceptor Drain, a project team headed by NTH was selected to provide engineering services based on the compiled recommended repairs for the EEI and the OAI/AAI from the January 2008 reports. These reports also recommended performing a geotechnical investigation of identified anomalies and a MASW survey of the downstream portion of the OAI be completed.

The work on OMID Contract was started in February 2014, and was completed in October.