NTH Consultants
Contact Us
  • Home
  • Markets
    • Energy Market
    • Industry Market
    • Water Market
    • Transportation
    • Community Development
  • Services
    • Geotechnical Engineering >
      • Geophysical Services
      • Mapping
      • Shoreline Services
      • Civil Site Engineering and Design
      • Construction Materials & Geotechnical Testing Services
      • Electric Substation Services
      • Geotechnical Engineering for Transportation Facilities
      • Underground Engineering Services
      • Subsurface Utility
      • Signature Projects
    • Environmental Services >
      • PFAS
      • Ecological Services
      • Environmental Health Services
      • Environmental Remediation Services
      • Environmental Compliance
      • Environmental Permitting
      • Environmental Site Assessments
      • Ecological Services for the Energy Market
      • Air Quality Permitting and Compliance
      • Brownfield Site Redevelopment
      • Environmental, Health & Safety Training for Employee Development
      • Hydrogeologic Studies
      • Landfill Related Services
      • Site Acquisition and Redevelopment
      • Storage Tank Services
      • Signature Projects
    • Facilities Engineering >
      • Decommissioning
      • Structural Condition Assessment Rehab
      • Bridge Engineering Services
      • Asset Management Services
      • Concrete Restoration
      • GIS Services
      • Masonry Evaluation Services
      • Pavement Engineering and Consulting
      • Roofing Technology Services
      • Structural Condition Assessment
      • Signature Projects
  • Projects
  • About Us
    • Mission + Core Values
    • Leadership
    • News and Events
    • Employee Portal
  • Webinars
    • Emergency Actions Plans Webinar
    • Challenges of Stormwater Management
  • Careers
    • Why Join NTH
    • Who We Are
    • Career Opportunities
    • NTH Internship Program
  • Blog
  • Contact Us

Livernois "Avenue of Fashion" Make Over

10/12/2020

1 Comment

 
NTH’s diverse, in-house team of civil engineering professionals were able to accomplish each of the various aspects of this major design for the new Livernois Streetscape under a very demanding project delivery schedule.
Picture
For decades, the City of Detroit has been known as “Motor City” due to longstanding status as the center of the automotive manufacturing industry within North America. As an indirect result of this history, many of Detroit’s streets had been designed to prioritize vehicular travel over public transportation, bicycle access, and pedestrian walkability. 
​
However, in recent years, new research has shown that there are measurable benefits that come from prioritizing all modes of transportation equally. This concept is called “complete streets” based on the idea that the street can effectively support several different modes of transportation at the same time. In 2018, the City of Detroit’s Department of Public Works - Complete Streets Division announced that seven key commercial corridors had been systematically identified as roadways that would benefit from a reconfigured streetscape based on these “complete streets” design principles. 

The first of these streetscape projects to officially begin was Livernois Ave between Margareta Street and 8 Mile Road. This area of Livernois Ave has been nicknamed the “Avenue of Fashion” thanks to its history of supporting locally-owned clothing stores, hair salons, and makeup shops, along with many well-regarded restaurants and one of Detroit’s oldest jazz clubs. NTH provided the construction plans and specifications to give Detroit’s “Avenue of Fashion” a complete makeover based on proven civil engineering designs and site layout practices.
Picture
Livernois Avenue previously configured as two lanes of traffic each direction, separated by a concrete, center-turn median
Picture
NTH resolved significant grading challenges on this relatively flat site to meet drainage, roadway, and City of Detroit requirements, while preserving the existing underground drainage network and configuration.
Livernois Avenue from Margareta Street to 8 Mile Road was previously configured as two lanes of traffic each direction at a moderately-high speed limit, separated by a concrete, center-turn median. In an effort to improve pedestrian walkability, increase bicycle access, and calm vehicular traffic flow, the City of Detroit undertook a complete streetscape re-design for 1.3 miles of Livernois Avenue. In coordination with the landscape architect, NTH provided the civil engineering plans and specifications for the removal of the median and existing travel configuration, completely re-designing the entire corridor to the right-of-way limits, including new roadway design, utility upgrades, expansion of the existing sidewalks, and the addition of separated bicycle lanes. 

As part of this redesign, NTH provided striping, maintenance of traffic, and staging plans to route traffic, and provided locations of temporary parking lots to promote access to businesses during construction. A proposed sequence of construction plan was designed by NTH and refined with input from the City and local representatives alike. 

NTH provided geotechnical investigations to determine soil conditions and feasibility of bioretention facilities on-site. NTH’s findings confirmed that bioretention areas would be a practical, sustainable way to manage stormwater runoff by infiltrating captured stormwater back into the soil. These geotechnical investigations also helped determine the behavior or the subgrade beneath the proposed roadway which factored into the pavement design. Since the roadway was being completely redesigned, NTH was able to create a new geometric design for the roadway’s vertical curves, which changed the stormwater flow regime substantially. NTH created utility plans that captured the runoff and decreased flooding, which was an issue previously. This new storm sewer layout had to tie-in with the previous sewer layout, and NTH was able to incorporate existing utilities and connections where possible, and NTH routed the new utilities in an efficient way that avoided many potential conflicts. These stormwater routes were refined by performing hydraulic and hydrologic analyses to ensure that the previous roadway drainage design would adequately serve the re-configured roadway design.

NTH also provided construction administration by answering submittals and Requests for Information as applicable during the construction process. As site conditions varied and new information was taken into account during construction, NTH provided several updated construction and grading plans as dictated by these unforeseen conditions. This ultimately saved time and money for the contractor and the owner by being responsive to the sometimes-unpredictable nature of the construction process. NTH’s adaptability and responsiveness kept the project on track during the height of construction season. ​
1 Comment
Timothy Arek link
11/3/2021 03:56:24 am

Excellent article! Your post is essential today. Thanks for sharing, by the way.

Reply



Leave a Reply.

    The NTH Narrator

    NTH Consultants, Ltd. (NTH) is a nationally recognized engineering firm specializing in Civil, Geotechnical, Environmental, and Facilities Engineering. 

    On our blog, our engineering experts address current news and events in our field, review new projects and highlight NTH news.

    Tweets by @nthconsultants

    RSS Feed

    Archives

    March 2023
    February 2023
    November 2022
    September 2022
    August 2022
    July 2022
    June 2022
    March 2022
    February 2022
    January 2022
    November 2021
    August 2021
    June 2021
    May 2021
    April 2021
    March 2021
    February 2021
    January 2021
    December 2020
    November 2020
    October 2020
    June 2020
    May 2020
    March 2020
    January 2020
    December 2019
    November 2019
    October 2019
    September 2019
    August 2019
    July 2019
    June 2019
    May 2019
    April 2019
    March 2019
    February 2019
    January 2019
    November 2018
    October 2018
    September 2018
    August 2018
    July 2018
    June 2018
    May 2018
    April 2018
    March 2018
    February 2018
    January 2018
    December 2017
    November 2017
    October 2017
    September 2017
    August 2017
    July 2017
    June 2017
    May 2017
    April 2017
    March 2017
    February 2017
    January 2017
    November 2016
    September 2016
    August 2016
    July 2016
    June 2016
    May 2016
    April 2016
    March 2016
    February 2016
    January 2016
    December 2015
    November 2015
    October 2015
    September 2015
    August 2015
    July 2015
    June 2015