NTH Consultants
Contact Us
  • Home
  • Markets
    • Energy Market
    • Industry Market
    • Water Market
    • Transportation
    • Community Development
  • Services
    • Geotechnical Engineering >
      • Geophysical Services
      • Mapping
      • Shoreline Services
      • Civil Site Engineering and Design
      • Construction Materials & Geotechnical Testing Services
      • Electric Substation Services
      • Geotechnical Engineering for Transportation Facilities
      • Underground Engineering Services
      • Subsurface Utility
      • Signature Projects
    • Environmental Services >
      • PFAS
      • Ecological Services
      • Environmental Health Services
      • Environmental Remediation Services
      • Environmental Compliance
      • Environmental Permitting
      • Environmental Site Assessments
      • Ecological Services for the Energy Market
      • Air Quality Permitting and Compliance
      • Brownfield Site Redevelopment
      • Environmental, Health & Safety Training for Employee Development
      • Hydrogeologic Studies
      • Landfill Related Services
      • Site Acquisition and Redevelopment
      • Storage Tank Services
      • Signature Projects
    • Facilities Engineering >
      • Decommissioning
      • Structural Condition Assessment Rehab
      • Bridge Engineering Services
      • Asset Management Services
      • Concrete Restoration
      • GIS Services
      • Masonry Evaluation Services
      • Pavement Engineering and Consulting
      • Roofing Technology Services
      • Structural Condition Assessment
      • Signature Projects
  • Projects
  • About Us
    • Mission + Core Values
    • Leadership
    • News and Events
    • Employee Portal
  • Webinars
    • Emergency Actions Plans Webinar
  • Careers
    • Why Join NTH
    • Who We Are
    • Career Opportunities
    • NTH Internship Program
  • Blog
  • Contact Us
Picture
Client:
Oakland County Water Resources Commissioner

Location:
Southfield, Michigan

Prime Consultant:
NTH Consultants, Ltd.

Client Name/Contact:
Michael McMahon, P.E

Total Project Budget:

$472,000

Total NTH Budget:
$69,320

Project Start:
December 9, 2013

Project Completion:
January 22, 2014

NTH’s Value Added: NTH’s quick response and expertise allowed traffic to be maintained on both the Northwestern Highway mainline and the service drive without interruption, speeded construction and reduced impact on the operations of nearby businesses.
Rummell Drain
Emergency Stabilization Of Undermined Foundations Averts Roadway Collapse

Project Overview
In November of 2013, NTH Consultants, Ltd. was retained to conduct an investigation into the cause of a sinkhole that developed in Southfield, Michigan. NTH’s analysis lead to a repair effort to stabilize the undermined foundations of the culvert and floor of the box sections that carry the drain beneath the service drive of Northwestern Highway (M-10) in Southfield, Michigan. 

Project Scope
NTH’s unique contribution to the project was the inspection team’s discovery that the natural soil bottom within the portion of the culvert that extends beneath the MDOT ROW was eroded due to discharge from two storm pipes on the sides of the drain. NTH was able to quickly identify that the discharge from these pipes projected away from the culvert walls in a jet that struck the channel bottom within the culvert. Because the pipes are connected to the roadway surface drainage system and convey flow from relatively nearby catch basins and other stormwater management structures, during short, intense precipitation events the maximum discharge from the pipes likely would occur before maximum flow is reached. Accordingly, the water depth within the culvert could remain relatively shallow and not provide much “cushion/dissipation” for the jets from the two pipes, leading to erosion of the channel bottom.

Through NTH’s quick response, planning and action, the team was able to:
  • Stabilize the undermined features with grout filled bags.
  • Fill remaining void space beneath and surrounding the three-sided culver and box drain.
  • Create a concrete floor to prevent future undermining at the downstream end of the box drain.
  • Allow for traffic to be maintained on both the Northwestern Highway mainline and the service drive without interruption.
  • Avoid the use of access shafts which speeded construction and reduced impact on the operations of nearby businesses.
 
​This project demonstrates a practical approach to addressing scouring and loss of support beneath culvert footings of similar construction. Because a similar design approach was used at other locations along Northwestern Highway and elsewhere, it is possible that this type of repair may be required elsewhere along the highway. In addition, it appears that since similar design was common for other MDOT projects built in the same time frame, routine inspection of such culverts is necessary, in order to avert situations similar to this location.